New regulations for landowner development near to overhead power lines

10 minutes ago
2 min read

Power lines running along your street or across your property could now affect your earthworks, building or subdivision plans.  Since 8 October 2026, amendments to the National Environmental Standards for Electricity Network Activities (NES-ENA) have changed how councils assess landowner development near overhead lines.


Electricity power pole and power lines close to a roof of a house.
Image: overhead lines within 30m of a structure

What's changed and why

The part of the updated regulation relevant to private land apply to local overhead lines (and other electricity assets) - bringing in a consistent national approach. They cover construction, alteration or extension of buildings and structures within 30m of these lines, as well as earthworks, boundary adjustments and subdivision on sites that contain overhead lines.


The new regulations are under the Resource Management Act, and work to protect the electricity network - ensuring line companies can reach and maintain their lines whilst keeping their people safe, and to protect current and future landowners in terms of safe separation distances.


The regulations relevant to private landowners only apply to overhead lines owned by network companies such as Vector, so private lines on your property and sites with only underground cables aren't affected.


Your project and what our team will look for

Power pole and power lines in a field with bush behind it and a fence in the front

If your project is a subdivision, our survey managers will prepare layout options (the Scheme Plan) that take into account any overhead lines.


In preparing your subdivision or land use application, our planners will check whether there are overhead lines on or near your site, and whether your project can meet the requirements.  Where relevant, they’ll also ensure nothing blocks vehicle access to poles for maintenance.


If your project meets these requirements, the overhead lines usually won't trigger a need for consent. The NES-ENA simply becomes one more part our planner will include in the subdivision or land use consent you're already applying for. 


If you can’t meet the requirements, or you are subdividing to create a new lot on a site with an overhead line, you will need consent. However, once our team works with you to ensure your proposal doesn’t create any unacceptable effects, it’s nearly always easy to achieve.


How we'll support you

With the changes to the NES-ENA in place, our team of surveyors and planners can guide you through the process and gather the right information for your project early. 


If needed, our survey team can conduct a survey of the actual 3D position of the lines using our drone-mounted LiDAR equipment. This is a fast, accurate and safe way to find out exactly how close the lines are to your project and whether the safe distances could be affected. We can then plot the power lines and poles on your concept plans, so any issues are picked up early and your application keeps moving.


More information

Not sure whether your project is affected? Get in touch with one of our team.